Current Project: Runway 3-21 , Charleston AFB
Finished Projects
AS A PRIME CONTRACTOR
| • |
Columbia Metropolitan Airport, West Columbia, SC (multiple projects) |
| • |
Tampa International Airport, Tampa, FL |
| • |
North Field Repair Taxiway Delta Charleston AFB, SC |
| • |
Florence Regional Airport, Florence, SC |
| • |
Fort Benning, GA |
| • |
Shaw AFB, SC (multiple projects) |
| • |
Moody AFB, GA (multiple projects) |
| • |
GA ANG Savannah, GA |
| • |
Thomasville Municipal Airport, GA |
| • |
Southwest Regional Airport, Albany, GA |
| • |
Spence Field, Moultrie, GA |
| • |
Greenville-Spartanburg, Greenville, SC |
| • |
City of Vidalia, GA |
AS A SUBCONTRACTOR
| • |
Shaw AFB, SC For Southern Management, Inc |
| • |
Shaw AFB, SC For Boykin Contracting, Inc. (multiple projects) |
| • |
Shaw AFB, SC For CNA Construction |
| • |
Ashley Phosphate Road, Charleston, SC For Landmark Construction |
| • |
Charleston AFB, SC For Banks Construction |
| • |
McEntire AFB, SC For Thompson Construction |
| • |
McEntire AFB, SC For Summerfield & Associates |
North Auxiliary Airfield, SC
Moody Air Force Base, GA
Shaw Air Force Base, SC
Columbia Metropolitan Airport
Summers Concrete Contracting and R. C. Construction of Greenwood Mississippi have teamed to pave Runway 3-21 at Charleston AFB. The project consists of 118,000 S.Y. of 15� pavement. This joint venture brings two high production concrete plants, two Gomaco paving trains and two highly motivated crews to bear upon the project.
Summers and R.C. blended crews to perform the intersection work which was the 200� on each side of the primary runway 15-33. This difficult piece of runway replacement had to be performed between the hours of 12:00 midnight and 6:00 AM. The concrete paving of this portion is now complete. The combined crew removed the old pavement structure, placed a new base course and paved 16 new lanes of 15� concrete from June 9th until July 5th. The shoulders and final electrical work are in progress.
Mr. John Powers, President of R. C. Construction and Brian Summers, President of Summers Concrete Contracting are very proud of the exemplary performance of the two crews and are looking forward to paving the rest of the project.
The current pictures depict some of this effort.
CLICK THE THUMBNAIL BELOW TO VIEW LARGER IMAGE:
Copyright 2008 Summers Concrete Contracting, Inc. All Rights Reserved - Web Design by TR LOGIC Data Recovery
Summers Concrete, Contracting, Inc. at Charleston AFB.
Summers� Airfield Project at Barksdale is 40,500 SY Apron Replacement. Summers and subcontractor F. J. Burnell are recycling 25,000 tons of existing concrete for drainage and base aggregate. The project engineer is Darin Bailey, NAVFAC Southeast ROICC Barksdale.�
Crushing at Barksdale AFB, Louisiana